Appendix B.8, Reservoir sedimentation /
"The purpose of this report is to present the results of analyses of sedimentation within the proposed Watana and Devil Canyon Reservoirs."--Leaf 1-1.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Power. Appendix B.8, Reservoir sedimentation Reservoir sedimentation Susitna Hydroelectric Project. Appendix B.8, Reservoir sedimentation Task 3, Hydrology. Subtask 3.07, Closeout report, reservoir sedimentation Subtask 3.07. Closeout report, reservoir sedimentation Closeout report, reservoir sedimentation Alaska Power Authority, Susitna Hydroelectric Power. Task 3, Hydrology. Subtask 3.07, Closeout report, reservoir sedimentation |
---|---|
Corporate Contributor(s): | R & M Consultants, Acres American Incorporated, Susitna Hydroelectric Project Alaska Power Authority, |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1248 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1248. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Purpose and scope of study
- Summary of reservoir sedimentation
- Trap efficiency
- Reservoir sedimentation
- Sedimentation processes and sediment distribution
- Reservoir and downstream turbidity
- Projected reservoir sedimentation
- Attachment A. Settling column studies
- Attachment B. Annotated bibliography.