Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative /

"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Title on fiche header: Susitna Hydroelectric Project, tunnel alternative report, Task 6, design development

Tunnel alternative report. Task 6, Design development

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative

Investigate tunnel alternative

Subtask 6.02, Closeout report, investigate tunnel alternative
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.
Publisher:Acres American,
Report Numbers:APA 335

APA 2758

SUS 62
Series:Document (Susitna Hydroelectric Project) ; no. 335.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03078cam a2200589Ia 4500
001 252434
003 SIRSI
005 20120217021618.0
007 he bm||||b|c|
007 cr bn||||a||||
008 860605s1981 nyuab bt 000 0 eng d
035 |a (OCoLC)42994145 
040 |a AkU  |c UAF  |d RLA 
049 |a RLAA 
088 |a APA 335 
088 |a APA 2758 
088 |a SUS 62 
090 |a TK1425.S8  |b A23 no. 335 
090 |a TA820.A4  |b S974 1981 
245 0 0 |a Task 6, design development.  |n Subtask 6.02,  |p Closeout report, investigate tunnel alternative /  |c prepared by Acres. 
246 1 |i Title on fiche header:  |a Susitna Hydroelectric Project, tunnel alternative report, Task 6, design development 
246 1 4 |a Tunnel alternative report.  |n Task 6,  |p Design development 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 6,  |p Design development.  |n Subtask 6.02,  |p Closeout report, investigate tunnel alternative 
260 |a Buffalo, N.Y. :  |b Acres American,  |c [1981] 
246 3 0 |a Investigate tunnel alternative 
246 3 0 |a Subtask 6.02,  |p Closeout report, investigate tunnel alternative 
300 |a 86 p. in various pagings :  |b ill., maps ;  |c 29 cm. 
490 1 |a [Document ;  |v no. 335] 
510 3 |a Assigned APA Document no. 335 in the Susitna Hydroelectric Project document index. Also assigned no. 2758 (duplicate entry). 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "Prepared by Acres"--Cover. 
500 |a "June 1981." 
510 3 |a Assigned SUS document no. 62 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1. 
504 |a Includes bibliographical references. 
505 0 |a Introduction -- Summary -- Scope of work -- Conceptual tunnel schemes -- Tunnel design and construction considerations -- Screening of conceptual tunnel schemes -- Preferred tunnel scheme -- Comparison with Devil Canyon dam scheme -- Conclusions and recommendations. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Water tunnels  |z Alaska  |z Susitna River Valley  |x Design and construction. 
650 0 |a Underground electric power plants  |z Alaska  |z Susitna River Valley  |x Design and construction. 
710 2 |a Alaska Power Authority. 
710 2 |a Acres American Incorporated. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 335. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/3/APA335.pdf  |z ARLIS Document Server 
901 |a 0104  |c TK1424.A4S98 no. 6.02a One copy on REF ALASKA also. 
901 |a 0057  |c ALASKA TA820.A4S974 1981 
901 |a 3755  |c TK1425.S8A23 no.335 
596 |a 9 10 11 
098 |a SUS 00062 
098 |a APA 00335 
098 |a APA 02758