Task 7, Environmental. Subtask 7.10, Fish ecology. Instream flow assessment for the proposed Susitna Hydroelectric Project. Issue identification and baseline data analysis, 1981 study plan /
An identification and evaluation of baseline streamflow and water quality conditions, and the nature and extent of both existing and anticipated uses of streamflows in the project area. Also defines aquatic and terrestrial resources likely to be affected by the proposed Susitna Hydroelectric Project...
Saved in:
LEADER | 04342cam a2200733Ia 4500 | ||
---|---|---|---|
001 | 250954 | ||
003 | SIRSI | ||
005 | 20140612014643.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 840406s1981 aku bt s000 0 eng d | ||
040 | |a AkU |c UAF |d RLA |d UAB |d OCLCF |d RLA | ||
019 | |a 70525391 | ||
035 | |a (OCoLC)41686433 |z (OCoLC)70525391 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 951 | |
050 | 4 | |a GB1225.A4 |b T73 1981 | |
088 | |a APA 476 | ||
088 | |a APA 951 | ||
088 | |a APA 3161 | ||
088 | |a SUS 7 | ||
049 | |a RLAA | ||
100 | 1 | |a Trihey, E. Woody, |e author. | |
245 | 1 | 0 | |a Task 7, Environmental. |n Subtask 7.10, |p Fish ecology. |p Instream flow assessment for the proposed Susitna Hydroelectric Project. |p Issue identification and baseline data analysis, 1981 study plan / |c prepared by E. Woody Trihey ; prepared for Acres American, Inc. |
246 | 3 | |a Susitna Hydroelectric Project. |n Task 7, |p Environmental. |n Subtask 7.10, |p Fish ecology. |p Instream flow assessment for the proposed Susitna Hydroelectric Project. |p Issue identification and baseline data analysis, 1981 study plan | |
246 | 3 | 0 | |a Subtask 7.10, |p Fish ecology. |p Instream flow assessment for the proposed Susitna Hydroelectric Project. |p Issue identification and baseline data analysis, 1981 study plan |
246 | 3 | 0 | |a Fish ecology. |p Instream flow assessment for the proposed Susitna Hydroelectric Project. |p Issue identification and baseline data analysis, 1981 study plan |
246 | 3 | 0 | |a Instream flow assessment for the proposed Susitna Hydroelectric Project. |p Issue identification and baseline data analysis, 1981 study plan |
246 | 3 | 0 | |a Issue identification and baseline data analysis, 1981 study plan |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1981] | ||
300 | |a 51 p. ; |c 28 cm. | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 476 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "May 31, 1981." | ||
500 | |a Series statement from label. | ||
510 | 3 | |a Assigned APA Document no. 951 in the Susitna Hydroelectric Project document index. Also assigned numbers 476 and 3161 (duplicate entries). The index lists no. 476 as 20 pages, no. 951 as 53 pages, and no. 3161 as 54 pages, each under a variation of the title. | |
510 | 3 | |a Assigned SUS document no. 7 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a An identification and evaluation of baseline streamflow and water quality conditions, and the nature and extent of both existing and anticipated uses of streamflows in the project area. Also defines aquatic and terrestrial resources likely to be affected by the proposed Susitna Hydroelectric Project in Alaska. | ||
505 | 0 | |a Introduction -- 1981 study plan -- Flow regime component -- Fishery resources component -- Water quality component -- Navigation component -- Water rights component -- Riparian vegetation and wildlife habitat component -- River based recreation component -- Estuarine component -- References. | |
504 | |a Includes bibliographical references (p. 51). | ||
650 | 0 | |a Anadromous fishes |x Habitat |z Alaska |z Susitna River. | |
650 | 0 | |a Instream flow |z Alaska |z Susitna River. | |
650 | 0 | |a Stream measurements |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Anadromous fishes |x Habitat. |2 fast |0 (OCoLC)fst00808233 | |
650 | 7 | |a Instream flow. |2 fast |0 (OCoLC)fst01740138 | |
650 | 7 | |a Stream measurements. |2 fast |0 (OCoLC)fst01134581 | |
710 | 2 | |a Alaska Power Authority. | |
650 | 7 | |a Water-power. |2 fast |0 (OCoLC)fst01172317 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
710 | 2 | |a Acres American Incorporated. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 476. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 951. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3161. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/9/APA951.pdf |z ARLIS Document Server |
901 | |a 3755 | ||
596 | |a 9 10 | ||
098 | |a SUS 00007 | ||
098 | |a APA 00476 | ||
098 | |a APA 00951 | ||
098 | |a APA 03161 |