Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project /
"The purpose of this report is to provide environmental input into the selection of an access plan for the Susitna Hydroelectric Project and to recommend an access plan that, from a total environmental standpoint, is judged to have the least impact, both short-term and long-term."--P. 1-1.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Environmental studies. Subtask 7.14, Environmental analysis of alternative access plans Alaska Power Authority, Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project Environmental studies. Subtask 7.14, Environmental analysis of alternative access plans Subtask 7.14, Environmental analysis of alternative access plans Environmental analysis of alternative access plans |
---|---|
Corporate Contributor(s): | Terrestrial Environmental Specialists. Susitna Hydroelectric Project. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 8 APA 296 APA 1324 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 8. Document (Susitna Hydroelectric Project) ; no. 296. Document (Susitna Hydroelectric Project) ; no. 1324. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Environmental analysis. Methods ; Criteria for evaluation ; Description of environmental resources ; Impact assessment ; Habitat value comparison ; Mitigation ; Conclusions
- Socioeconomic and land use analysis. Methods ; Criteria for evaluation ; Description of resources ; Impact assessment ; Mitigation ; Conclusions.