Mercury assessment and potential for bioaccumulation study (Study 5.7), Errata to evaluation of continued mercury monitoring beyond 2014 technical memorandum (September 30, 2014) /
In 2013 a mercury assessment and potential for bioaccumulation study (Study 5.7) was started to support research to be submitted in the license application for the Susitna-Watana Hydroelectric Project. The objectives of the study are to determine (1) whether inundated conditions will cause mercury m...
Saved in:
Alternate Title: | Errata to evaluation of continued mercury monitoring beyond 2014 technical memorandum (September 30, 2014) Technical memorandum, evaluation of continued mercury monitoring beyond 2014 |
---|---|
Corporate Contributor(s): | Tetra Tech, Inc. Alaska Energy Authority. Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 268 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 268. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | In 2013 a mercury assessment and potential for bioaccumulation study (Study 5.7) was started to support research to be submitted in the license application for the Susitna-Watana Hydroelectric Project. The objectives of the study are to determine (1) whether inundated conditions will cause mercury methylation, (2) concentrations of methylmercury that might occur, and (3) whether methylation can be transferred to wildlife with detrimental effects. This document describes the components of the study completed in 2014 and the approach to complete the study. |
---|---|
Physical Description: | 1, ii, 13, 16 p. : col. ill., col. map ; 28 cm. |
Notes: | "Susitna-Watana Hydroelectric Project (FERC No. 14241)." "November 2014." ARLIS assigned report number: SuWa 268. This document was filed to FERC as Attachment N to: Filing of Initial Study Plan meetings transcripts and additional information in response to October 2014 Initial Study Plan meetings. (SuWa 254). The first section ("Errata to Evaluation of continued mercury monitoring ...") is a one-page list of errata contained in this document. The second section ("Mercury assessment ..., Evaluation of continued mercury monitoring ...") (PDF pages 3-18) replaces the entirety of: Mercury assessment and potential for bioaccumulation study (Study 5.7), Evaluation of continued mercury monitoring beyond 2014, technical memorandum / prepared for Alaska Energy Authority ; prepared by Tetra Tech. (SuWa 249). The third section of this document (PDF pages 19-34) replaces Part B, pages 100-115 of: Initial Study Report Meetings, October 16, 2014 : Millennium Hotel, 4800 Spenard Road, Anchorage, Alaska 99517. (SuWa 256). |
Report Type: | November 14, 2014 technical memorandum filings. Technical memorandum. |
Related Titles: | Replacement of (expression): Mercury assessment and potential for bioaccumulation study (Study 5.7), evaluation of continued mercury monitoring beyond 2014, technical memorandum. Revised. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 249 SuWa 249 Originally submitted as Attachment N to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 254 SuWa 254 |
Bibliography: | Includes bibliographical references. |