Wetland mapping study in the upper and middle Susitna basin, Study plan Section 11.7, Initial Study Report /

The purpose of the wetland mapping study is to classify, delineate, and map the wetlands occurring in the inundation zone of the proposed Watana Reservoir, the area of the proposed Project dam site and associated infrastructure, and along the corridors of the three possible Susitna-Watana transmissi...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 11.7, Wetland mapping study in the upper and middle Susitna basin.

Initial Study Report. Wetland mapping study in the upper and middle Susitna basin (11.7)
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

ABR, Inc.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The purpose of the wetland mapping study is to classify, delineate, and map the wetlands occurring in the inundation zone of the proposed Watana Reservoir, the area of the proposed Project dam site and associated infrastructure, and along the corridors of the three possible Susitna-Watana transmission lines/roads (this includes the corridor north to the Denali Highway and to Cantwell). A wetland functional assessment will also be conducted to determine the specific functions that the wetlands in the study area provide.
Physical Description:56 pages in various pagings : color illustrations, color maps ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Report Type:Initial Study Report.
Bibliography:Includes bibliographical references (Part A, pages 20-22).