Initial Study Report overview /

This document is an overview of the 58 reports for the Initial Study Report (ISR) for the original licensing of the proposed Susitna-Watana Hydroelectric Project (Federal Energy Regulatory Commission Project No. 14241). This June 2014 filing contains only parts A, B, and C of each report (all parts...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. ISR overview
Corporate Author: Alaska Energy Authority,
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

United States. Federal Energy Regulatory Commission,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document is an overview of the 58 reports for the Initial Study Report (ISR) for the original licensing of the proposed Susitna-Watana Hydroelectric Project (Federal Energy Regulatory Commission Project No. 14241). This June 2014 filing contains only parts A, B, and C of each report (all parts D were submitted in November 2015). This multi-volume set of technical documentation describes Alaska Energy Authority's status in implementing the initial studies, which are ongoing and scheduled to be completed during the 2014 and 2015 study years.
Physical Description:i, 24 pages : color map ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"June 2014."

ARLIS assigned report number: SuWa 223.

Accompanied by a cover letter dated June 3, 2014 addressed to Kimberly D. Bose (Secretary, Federal Energy Regulatory Commission (FERC)) from Wayne Dyok (Project Manager, Alaska Energy Authority). The letter is titled: Susitna-Watana Hydroelectric Project, Project No. 14241-000; Filing and distribution of Initial Study Report.
Report Type:Initial Study Report.