Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Initial Study Report /
Baseline information is being collected regarding eulachon (Thaleicthys pacificus) run timing, distribution, and habitat use in the Susitna River. Eulachon is an important prey species for the endangered Cook Inlet beluga whale (Delphinapterus leucas); thus, this study has been designed to support t...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 9.16, Eulachon run timing, distribution, and spawning in the Susitna River. Initial Study Report. Eulachon run timing, distribution, and spawning in the Susitna River (9.16) |
---|---|
Corporate Contributor(s): | HDR, Inc. LGL Alaska Research Associates. Susitna-Watana Hydroelectric Project. Alaska Energy Authority, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Baseline information is being collected regarding eulachon (Thaleicthys pacificus) run timing, distribution, and habitat use in the Susitna River. Eulachon is an important prey species for the endangered Cook Inlet beluga whale (Delphinapterus leucas); thus, this study has been designed to support the Cook Inlet beluga whale study (Study 9.17). This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued February 1, 2013. |
---|---|
Physical Description: | 107 pages in various pagings : color illustrations, color maps, color charts ; 28 cm. |
Notes: | "Susitna-Watana Hydroelectric Project (FERC No. 14241)." Parts A, B, and C are dated: June 2014. Part D is dated: November 2015. ARLIS assigned report number: SuWa 223. |
Report Type: | Initial Study Report. |
Bibliography: | Includes bibliographical references (Part A, pages 23-24). |