Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, Initial Study Report /

The objectives of the study are to quantify the current mercury concentrations in the proposed inundation zone of the reservoir of the proposed Susitna-Watana Hydroelectric Project and to estimate the potential changes to mercury concentrations after impoundment and the effects these changes will ha...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 5.7, Mercury assessment and potential for bioaccumulation study.

Initial Study Report. Mercury assessment and potential for bioaccumulation study (5.7)

Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

URS Corporation,

Tetra Tech, Inc.,

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (work): Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04128cam a2200577Ia 4500
001 2379443
003 SIRSI
005 20170301174855.0
007 ta
007 cr cn||a||||||
008 150318m20142015akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCQ  |d RLA  |d OCLCO  |d RLA  |d OCLCO  |d RLA 
035 |a (OCoLC)905115316 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 5.7 
088 |a SuWa 223 
130 0 |a Initial Study Report.  |n Study plan Section 5.7,  |p Mercury assessment and potential for bioaccumulation study. 
245 1 0 |a Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, Initial Study Report /  |c prepared by URS Corporation/Tetra Tech, Inc. 
246 1 7 |a Initial Study Report.  |p Mercury assessment and potential for bioaccumulation study (5.7) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 91 pages in various pagings :  |b color illustrations, color maps, color charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
580 |a Succeeded by: Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, 2014 Study Implementation Report. -- October and November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). 
530 |a Available also in electronic format on the Internet. 
520 |a The objectives of the study are to quantify the current mercury concentrations in the proposed inundation zone of the reservoir of the proposed Susitna-Watana Hydroelectric Project and to estimate the potential changes to mercury concentrations after impoundment and the effects these changes will have on the ecosystem. This draft document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued April 1, 2013. Tables list the vegetation, soil, and water samples collected. 
505 0 |a Part A. Sections 1-6, 8-10 -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A: pages 21-23). 
650 0 |a River sediments  |x Mercury content  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Mercury  |x Bioaccumulation  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Animals  |x Mercury content  |x Research  |z Alaska  |z Susitna River. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
710 2 |a URS Corporation,  |e author. 
710 2 |a Tetra Tech, Inc.,  |e author. 
710 2 |a Susitna-Watana Hydroelectric Project. 
730 0 |i Succeeded by (work):  |a Mercury assessment and potential for bioaccumulation study, Study plan Section 5.7, 2014 Study Implementation Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec5-7ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this document.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 5.7). List includes related Initial Study Reports.  |z ARLIS Document Server 
098 |a SuWa 00223 
596 |a 10