Aquatic monitoring manual /

This manual was written for the use by the SuHydro Aquatic Study Team in carrying out long-term monitoring of impacts on fish and aquatic habitats as a result of the Susitna Hydroelectric Project. The focus of the monitoring will be downstream of the damsites to determine baseline and with-project c...

Full description

Saved in:
Bibliographic Details
Alternate Title:In the prefaces of numbers 1 and 2 in the series, this report is called: Aquatic monitoring plan

Susitna Hydroelectric Project. Aquatic monitoring manual
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 3414
Series:Document (Susitna Hydroelectric Project) ; no. 3414.
Impact assessment and mitigation report ; no. 4.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This manual was written for the use by the SuHydro Aquatic Study Team in carrying out long-term monitoring of impacts on fish and aquatic habitats as a result of the Susitna Hydroelectric Project. The focus of the monitoring will be downstream of the damsites to determine baseline and with-project conditions, evaluate mitigation measures, refine operation procedures and mitigation measures, and determine impacts on aquatic resources.
Physical Description:ii, 56 p. ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"April 1986."

"Susitna File no. 4.3.1."

"Federal Energy Regulatory Commission, Project No. 7114"--Cover.

This work was identified by Christopher Estes as no. 4 in the series: Impact assessment and mitigation report. The prefaces of numbers 1 and 2 also identify this report as the third volume in that series, but they list the title as: Aquatic monitoring plan.
Report Type:Draft report.
Bibliography:Includes bibliographical references (p. 56).