Fish and aquatics instream flow study, Study plan Section 8.5, Initial Study Report /

A study of existing aquatic habitats in the Susitna River watershed is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project opera...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.5, Fish and aquatics instream flow study. Draft.

Initial Study Report. Fish and aquatics instream flow study 8.5
Corporate Contributor(s):R2 Resource Consultants.

Brailey Hydrologic (Firm)

Geovera (Firm)

Golder Associates.

Geo-Watershed Scientific (Firm)

Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 207
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 207.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03940cam a2200649Ia 4500
001 2371501
003 SIRSI
005 20160509083734.0
007 ta
007 cr cn||||a||||
008 150113s2014 akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCF  |d RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)900091163 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 207 sec. 8.5 
088 |a SuWa 207 
049 |a RLAA 
130 0 |a Initial Study Report.  |n Study plan Section 8.5,  |p Fish and aquatics instream flow study.  |s Draft. 
245 1 0 |a Fish and aquatics instream flow study, Study plan Section 8.5, Initial Study Report /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. 
246 1 7 |a Initial Study Report.  |p Fish and aquatics instream flow study 8.5 
250 |a Draft. 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014] 
300 |a 499 pages in various pagings :  |b color illustrations, color maps, color charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207 
500 |a "February 2014." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 207. 
513 |a Draft Initial Study Report. 
510 3 |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. 
500 |a Appendices A and C prepared also by Brailey Hydrologic, Geovera, and GWS. 
500 |a Appendix I prepared by Golder Associates. 
530 |a Available also in electronic format on the Internet. 
520 |a A study of existing aquatic habitats in the Susitna River watershed is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operational scenarios. 
505 0 0 |g [Main report] -- Figures -- appendix A.  |t Hydrologic data collection methods --  |g appendix B.  |t Biological cues study --  |g appendix C.  |t 2013 moving boat ADCP measurements --  |g appendix D.  |t GINA initial study report 8.5 data files --  |g appendix E.  |t Tributary gaging site schematics --  |g appendix F.  |t Tributary gaging representative site photos --  |g appendix G.  |t HSC histogram plots --  |g appendix H.  |t Periodicity tables --  |g appendix I.  |t Lower river hydraulic model calibration. 
504 |a Includes bibliographical references (main volume: pages 97-107). 
650 0 |a Freshwater habitats  |z Alaska  |z Susitna River Watershed. 
650 0 |a Instream flow  |z Alaska  |z Susitna River Watershed. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
610 2 7 |a Susitna-Watana Hydroelectric Project.  |2 fast  |0 (OCoLC)fst01917261 
650 7 |a Freshwater habitats.  |2 fast  |0 (OCoLC)fst01749467 
650 7 |a Instream flow.  |2 fast  |0 (OCoLC)fst01740138 
651 7 |a Alaska  |z Susitna River Watershed.  |2 fast  |0 (OCoLC)fst01265160 
710 2 |a R2 Resource Consultants. 
710 2 |a Brailey Hydrologic (Firm) 
710 2 |a Geovera (Firm) 
710 2 |a Golder Associates. 
710 2 |a Geo-Watershed Scientific (Firm) 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec8-5.pdf  |x This URL for the main text of this report is needed for image to display in the OPAC.  |3 Direct link to the main text of this report.  |z ARLIS Document Server 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html  |3 List of all parts of this document (see Section 8.5). List includes all draft Initial Study Reports.  |z ARLIS Document Server 
596 |a 10 
098 |a SuWa 00207