Susitna Hydroelectric Project. Draft supplement to the feasibility report /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Supplement to the feasibility report. Draft.

Draft supplement to the feasibility report

Supplement to the feasibility report
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated,

Alaska Power Authority,

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 614
Series:Document (Susitna Hydroelectric Project) ; no. 614.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:[155] pages : illustrations, maps, charts ; 28 cm.
Notes:"February 1983."

Series statement from label on cover.

Table of contents does not match actual contents.

Cataloging based on incomplete copy. Only volume 1 of the draft is known. The beginning of the table of contents is missing. Section 10.6(c) is blank (perhaps intentionally). The document ends with Figure 10.6 although the table of contents lists chapter 11, chapter 12, and volume 2 (plates). The final version has two complete volumes.
Supplement of:Susitna Hydroelectric Project feasibility report. Final draft. [Anchorage, Alaska] : Alaska Power Authority, [1982] APA 174-182 SUS 38
Related Titles:Revised as: Susitna Hydroelectric Project feasibility report. Supplement. [Final]. [Anchorage, Alaska] : Alaska Power Authority, [1983] Full two-volume set. APA 504-505
Bibliography:Includes bibliographical references (page after Table 10.15).