[Responses to FERC non-conforming items revision lists to sections of Exhibit B & D, and draft responses to FERC Schedule A, Exhibit F items].

This document contains three sections of the licensing document for the Susitna Hydroelectric Project: Exhibit B (Statement of power needs and utilization), Exhibit D (Project cost and financing) as well as Schedule A, Exhibit F (on design). These sections were edited by hand for the June 7-8, 1983...

Full description

Saved in:
Bibliographic Details
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.
Publisher:Harza-Ebasco Susitna Joint Venture,
Report Numbers:APA 2499
Series:Document (Susitna Hydroelectric Project) ; no. 2499.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02458cam a2200445Ia 4500
001 2051782
003 SIRSI
005 20140814181136.0
007 ta
007 cr bn||a||||||
008 140814s1983 akuab bt 000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)886974726 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 2499 
088 |a APA 2499 
245 0 0 |a [Responses to FERC non-conforming items revision lists to sections of Exhibit B & D, and draft responses to FERC Schedule A, Exhibit F items]. 
260 |a [Anchorage, Alaska :  |b Harza-Ebasco Susitna Joint Venture,  |c 1983] 
300 |a [365] p. :  |b ill., maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 2499 
500 |a Title from Susitna Hydroelectric Project document index. 
500 |a Includes cover letter to Robert A. Mohn, Project Manager, Alaska Power Authority, from Richard L. Meagher, Acting Project Manager, dated June 6, 1983. 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 2499 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a This document contains three sections of the licensing document for the Susitna Hydroelectric Project: Exhibit B (Statement of power needs and utilization), Exhibit D (Project cost and financing) as well as Schedule A, Exhibit F (on design). These sections were edited by hand for the June 7-8, 1983 Review Committee Meeting. They were sent from Harza-Ebasco Susitna Joint Venture to Alaska Power Authority. The exact original resource (title, version, and date of the document) being reviewed has not been identified or found among those documents assigned APA or SUS numbering. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Energy consumption  |x Research  |z Alaska. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2499. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/24/APA2499.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 02499