The Susitna Hydroelectric Project simulation of reservoir operations /

Computer simulation modeling of reservoir operations was conducted for two proposed dams for the Susitna Hydroelectric Project--the Watana Dam (both low and high options) and the Devil Canyon Dam--using streamflow records of 34 years. The results allow the selection of preferred flow to meet project...

Full description

Saved in:
Bibliographic Details
Main Author: Wu, Yaohuang,
Additional Author(s):Gemperline, E. J.

Feinstein, Joel I.,
Report Numbers:APA 4140
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Computer simulation modeling of reservoir operations was conducted for two proposed dams for the Susitna Hydroelectric Project--the Watana Dam (both low and high options) and the Devil Canyon Dam--using streamflow records of 34 years. The results allow the selection of preferred flow to meet projected energy requirements with no net loss of fish habitat.
Physical Description:p. 3-11 : 11 ill., 1 map ; 29 cm.
Notes:Caption title.
Related Titles:Originally published in: Symposium: Cold Regions Hydrology (1986 : University of Alaska, Fairbanks). Proceedings of the Symposium, Cold Regions Hydrology. Bethesda, Md. : American Water Resources Association, 1986 pages 3-11
Bibliography:Includes bibliographical references (p. 11).