Revised study plan determination schedule.
A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana...
Saved in:
Alternate Title: | Reference: Revised study plan determination schedule |
---|---|
Main Author: | |
Additional Author(s): | Dyok, Wayne, |
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Office of Energy Projects. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Report Numbers: | SuWa 88 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 88. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana Hydroelectric Project. This letter is in response to a letter from Alaska Energy Authority dated January 7, 2013 requesting the Commission staff withdraw the revised schedule that had been requested in a letter dated January 7, 2013. |
---|---|
Physical Description: | 5 p. ; 28 cm. |
Notes: | Title from caption. At head of title: "Reference:". "Project No. 14241-000 - Alaska, Susitna-Watana Hydroelectric Project, Alaska Energy Authority." "January 17, 2012." ARLIS assigned report number: SuWa 88. |
Report Type: | Correspondence. |
Related Titles: | Alaska Energy Authority. Revised study plan. [Anchorage : Alaska Energy Authority, 2012] Reply to: Fisher-Goad, Sara. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000. 2013 January 7 Susitna-Watana Hydroelectric Project document ; no. 87 SuWa 87 |