Environmental implications of design changes, Environmental evaluation memorandum no. 1, Project optimization and justification.

This document comprises a draft version of an appendix called "Environmental implications of alternative development concepts." This appendix is intended for an engineering report called "Susitna Project, initial review and evaluation. Part B, Project optimization and justification.&q...

Full description

Saved in:
Bibliographic Details
Alternate Title:Environmental implications of design changes, project optimization and justification

Caption title on first page for the appendix: Environmental implications of alternative development concepts
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.
Publisher:Harza-Ebasco Susitna Joint Venture,
Report Numbers:APA 2426
Series:Environmental evaluation memorandum ; no. 1.
Document (Susitna Hydroelectric Project) ; no. 2426.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02775nam a2200493Ia 4500
001 2039996
003 SIRSI
005 20140611044908.0
007 ta
007 cr bn||||a||||
008 140611s1983 akua t 000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)881289940 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 2426 
088 |a APA 2426 
049 |a RLAA 
245 0 0 |a Environmental implications of design changes, Environmental evaluation memorandum no. 1, Project optimization and justification. 
246 3 0 |a Environmental implications of design changes, project optimization and justification 
246 1 |i Caption title on first page for the appendix:  |a Environmental implications of alternative development concepts 
260 |a [Alaska :  |b Harza-Ebasco Susitna Joint Venture,  |c 1983] 
300 |a iii, 33, [2] p. :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 2426 
500 |a Title from caption on page i of memorandum. 
500 |a "28 April 83 [i.e. 1983]." 
500 |a Harza-Ebasco series statement from label on page i. 
510 3 |a Assigned APA Document no. 2426 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a This document comprises a draft version of an appendix called "Environmental implications of alternative development concepts." This appendix is intended for an engineering report called "Susitna Project, initial review and evaluation. Part B, Project optimization and justification." That report was to evaluate alternative development options to the Susitna Hydroelectric Project (such as fill dam vs. arch dam, Devil Canyon vs. High Devil Canyon vs. Vee Canyon dams, etc.), and this appendix considers environmental implications of these alternatives. However, it is unknown whether that report had been released. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Design and construction  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Environmental aspects  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Environmental evaluation memorandum ;  |v no. 1. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2426. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/24/APA2426.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
098 |a APA 02426 
596 |a 9 10