Book Q. Watana Dam/Devil Canyon indirects feasibility report.

This collection of tables (chiefly on hand-completed worksheets called 'Calculations' or 'Estimate summary') were made by Acres American Incorporated in 1982, and regard estimated indirect costs for the proposed Susitna Hydroelectric Project.

Saved in:
Bibliographic Details
Alternate Title:Watana Dam/Devil Canyon indirects feasibility report

Title on vertical label on title page: Watana Dam/Devil Canyon feasibility report indirects

Caption title on table of contents page: Unit costs - backup calculations, Watana Dam/Devil Canyon indirects, feasibility report

(Q). Unit costs - backup calculations, Watana Dam/Devil Canyon indirects, feasibility report
Corporate Contributor(s):Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 258
Series:Document (Susitna Hydroelectric Project) ; no. 258.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02766nam a2200505Ia 4500
001 2038589
003 SIRSI
005 20140523011044.0
007 ta
007 cr bn||||a||||
008 140522s1982 nyu t 000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)880402214 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 258 
088 |a APA 258 
049 |a RLAA 
245 0 0 |a Book Q.  |p Watana Dam/Devil Canyon indirects feasibility report. 
246 3 0 |a Watana Dam/Devil Canyon indirects feasibility report 
246 1 |i Title on vertical label on title page:  |a Watana Dam/Devil Canyon feasibility report indirects 
246 1 |i Caption title on table of contents page:  |a Unit costs - backup calculations, Watana Dam/Devil Canyon indirects, feasibility report 
246 3 |a (Q).  |p Unit costs - backup calculations, Watana Dam/Devil Canyon indirects, feasibility report 
260 |a [Buffalo, N.Y.? :  |b Acres American Incorporated,  |c 1982] 
300 |a 317 [i.e. 307] p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Handwritten at head of title on title page: Task 9 - Group 12. 
500 |a At head of caption title on table of contents page: (Q). 
500 |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. 
510 3 |a Assigned APA Document no. 258 in the Susitna Hydroelectric Project document index. 
500 |a Cataloging based on copy with gaps in the paging sequence. 
530 |a Available also in electronic format on the Internet. 
520 |a This collection of tables (chiefly on hand-completed worksheets called 'Calculations' or 'Estimate summary') were made by Acres American Incorporated in 1982, and regard estimated indirect costs for the proposed Susitna Hydroelectric Project. 
505 0 |a Watana -- Devil Canyon -- Supervision -- Staff mobilization -- Staff vehicles -- Misc. equipment -- Consumables -- Plant & utilities -- Yard services -- Office expense -- General expense -- Watana/Devil Canyon comparison. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Overhead costs. 
710 2 |a Acres American Incorporated. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 258. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/2/APA258.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00258