Book F. Susitna camp estimates.
A collection of hand-completed worksheets (some are called 'Calculations' or 'Estimate work sheet') primarily from Acres American Incorporated, Frank Moolin & Associates, Inc., and Alaska International Construction, Inc. regarding estimated costs for the Susitna Hydroelectric...
Saved in:
Alternate Title: | Susitna camp estimates Title for entry 252 in the Susitna Hydroelectric Project document index: Susitna camp estimates, Book F, Task 9 - Group 12 Title on label on binder cover of second volume: Task 9 - Group 12, Book F, Susitna camp estimates Caption title on page 1 (table of contents page) and title for entry 105 in the Susitna Hydroelectric Project document index: Unit prices - backup calculations, Susitna camp estimates (F). Unit prices - backup calculations, Susitna camp estimates |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Frank Moolin & Associates. Alaska International Construction, Inc. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | [Acres American Incorporated], |
Report Numbers: | APA 105 APA 252 APA 252A APA 252B |
Series: | Document (Susitna Hydroelectric Project) ;
no. 105. Document (Susitna Hydroelectric Project) ; no. 252. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04508cam a2200661Ia 4500 | ||
---|---|---|---|
001 | 2038582 | ||
003 | SIRSI | ||
005 | 20160415103706.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140521s1982 nyua t 000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCO |d OCLCQ |d RLA | ||
035 | |a (OCoLC)880356512 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 105 | |
088 | |a APA 105 | ||
088 | |a APA 252 | ||
088 | |a APA 252A | ||
088 | |a APA 252B | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Book F. |p Susitna camp estimates. |
246 | 3 | 0 | |a Susitna camp estimates |
246 | 1 | |i Title for entry 252 in the Susitna Hydroelectric Project document index: |a Susitna camp estimates, Book F, Task 9 - Group 12 | |
246 | 1 | |i Title on label on binder cover of second volume: |a Task 9 - Group 12, Book F, Susitna camp estimates | |
246 | 1 | |i Caption title on page 1 (table of contents page) and title for entry 105 in the Susitna Hydroelectric Project document index: |a Unit prices - backup calculations, Susitna camp estimates | |
246 | 3 | |a (F). |p Unit prices - backup calculations, Susitna camp estimates | |
260 | |a [Buffallo, N.Y.?] : |b [Acres American Incorporated], |c [1982?] | ||
300 | |a 2 volumes (397 [i.e. 391] pages) : |b illustrations ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 105, 252 | |
500 | |a Title from label on what appears to be the title page of the first volume from a poor reproduction. Series statement from label on binder covers. | ||
500 | |a Handwritten at head of title on title page label: Task 9 - Group 12. | ||
500 | |a At head of caption title on page 1: (F). | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Pages are numbered by hand on the bottom through 397 and on top through F389. Neither numbering is an accurate count of the pages. Total number of pages is 391. | ||
500 | |a The Susitna Hydroelectric Project document index states that this document is from Frank Moolin and Associates, but only some sheets within the document were filled out by that firm. All volumes in the "Book" set were released by Acres American Incorporated in 1982. The index also gives an incorrect page count and publication date. The index compiler looked only at the first volume for the paging and looked only at the handwritten date of the first calculation sheet for the date. | ||
510 | 3 | |a Assigned APA Document number 105 in the Susitna Hydroelectric Project document index. Also assigned number 252 (duplicate entry); the index refers to the two volumes as 252A and 252B. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A collection of hand-completed worksheets (some are called 'Calculations' or 'Estimate work sheet') primarily from Acres American Incorporated, Frank Moolin & Associates, Inc., and Alaska International Construction, Inc. regarding estimated costs for the Susitna Hydroelectric Project. Includes several typed tables and memorandums. | ||
505 | 0 | |a Watana earthwork -- Watana buildings -- Watana utilities -- Watana indirects -- Devil Canyon earthwork -- Devil Canyon buildings -- Devil Canyon utilities -- Devil Canyon indirects -- Watana permanent town plant -- Manday costs -- Electrical -- Heating/ventilating -- Site roads -- P.O.L. -- Access roads. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Frank Moolin & Associates. | |
710 | 2 | |a Alaska International Construction, Inc. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 105. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 252. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA105a.pdf |3 Direct link to first volume. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA105.html |3 List of volumes. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 00105 | ||
098 | |a APA 00252 | ||
098 | |a APA 00252A | ||
098 | |a APA 00252B |