Hi-volume air monitoring program. Interim monitoring and quality assurance report /

Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to m...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Hi-volume air monitoring program. Interim monitoring and quality assurance report
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1696
Series:Document (Susitna Hydroelectric Project) ; no. 1696.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Measured TSP concentrations
  • Quality assurance results.