Report, September 8, 1981 /
This document contains the minutes and presentation materials of the fourth Susitna Hydroelectric Project Internal Review Board Meeting. The meeting is also called the fourth Acres Internal Review Board Meeting (whether the smaller panels that make up the Board had met separately or concurrently wit...
Saved in:
Summary: | This document contains the minutes and presentation materials of the fourth Susitna Hydroelectric Project Internal Review Board Meeting. The meeting is also called the fourth Acres Internal Review Board Meeting (whether the smaller panels that make up the Board had met separately or concurrently with the Board meeting is unclear). The attendees discussed the status of all studies (particularly the seismic and geotechnical field work), spillway designs, Devil Canyon layout and dam analyses, and Watana Dam layout and relict channel. |
---|---|
Physical Description: | [139] p. : ill., maps, plans ; 28 cm. |
Notes: | Title from cover. At head of statement of responsibility and title: Susitna Hydroelectric Project. At head of title on table of contents page: Alaska Power Authority, Susitna Hydroelectric Project, Internal Review Board Meeting no. 4. This document is dated "September 30, 1981" on the table of contents page. |