Report on Acres Internal Review Board Meeting no. 3, Niagara Falls, Canada, February 10, 1981.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Report on Acres Internal Review Board Meeting no. 3, Niagara Falls, Canada, February 10, 1981
Corporate Author: Susitna Hydroelectric Project. Acres Internal Review Board. Meeting (3rd : 1981 : Niagara Falls, Ont.)
Corporate Contributor(s):Susitna Hydroelectric Project.

Alaska Power Authority.

Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 1388
Series:Document (Susitna Hydroelectric Project) ; no. 1388.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 01911cam a2200433Ia 4500
001 2025972
003 SIRSI
005 20140319014141.0
007 cr bn||||a||||
008 140319s1981 nyu 100 0 eng d
035 |a (OCoLC)873950375 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1388 
088 |a APA 1388 
110 2 |a Susitna Hydroelectric Project.  |b Acres Internal Review Board.  |b Meeting  |n (3rd :  |d 1981 :  |c Niagara Falls, Ont.) 
245 1 0 |a Report on Acres Internal Review Board Meeting no. 3, Niagara Falls, Canada, February 10, 1981. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Report on Acres Internal Review Board Meeting no. 3, Niagara Falls, Canada, February 10, 1981 
260 |a Buffalo, N.Y. :  |b Acres American Incorporated,  |c [1981] 
300 |a [9] leaves ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
510 3 |a As signed APA Document no. 1388 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Susitna Hydroelectric Project  |v Congresses. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |v Congresses. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a Acres American Incorporated. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1388.pdf  |z ARLIS Document Server 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1388. 
043 |a n-us-ak 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01388