Internal Board Review Meeting #2, Status of tasks 4, 5 and 6, October 14, 1980, APA Review Meeting, Status of generation planning studies, October 15, 1980, notes on meetings.
This document contains the notes of two meetings: the first section contains the notes from the second Susitna Hydroelectric Project Internal Review Board Meeting held at the Acres Consulting Services Office in Niagara Falls, Ont. on October 14, 1980; the second section contains the notes from the S...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Internal Board Review Meeting #2, Status of tasks 4, 5 and 6, October 14, 1980, APA Review Meeting, Status of generation planning studies, October 15, 1980, notes on meetings |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna Hydroelectric Project. APA Review Meeting (1980 : Buffalo, N.Y.) Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1387 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1387. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02775cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 2025971 | ||
003 | SIRSI | ||
005 | 20140319014141.0 | ||
007 | cr bn||||a|||| | ||
008 | 140318s1980 nyuab 000 0 eng d | ||
035 | |a (OCoLC)873872271 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1387 | |
088 | |a APA 1387 | ||
110 | 2 | |a Susitna Hydroelectric Project. |b Internal Review Board. |b Meeting |n (2nd : |d 1980 : |c Niagara Falls, Ont.) | |
245 | 1 | 0 | |a Internal Board Review Meeting #2, Status of tasks 4, 5 and 6, October 14, 1980, APA Review Meeting, Status of generation planning studies, October 15, 1980, notes on meetings. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Internal Board Review Meeting #2, Status of tasks 4, 5 and 6, October 14, 1980, APA Review Meeting, Status of generation planning studies, October 15, 1980, notes on meetings | |
260 | |a Buffalo, N.Y. : |b Acres American Incorporated, |c [1980] | ||
300 | |a 113 p. : |b ill., maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 1387 | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 1387 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
500 | |a This document is dated "November 5, 1980" on page 5. | ||
520 | |a This document contains the notes of two meetings: the first section contains the notes from the second Susitna Hydroelectric Project Internal Review Board Meeting held at the Acres Consulting Services Office in Niagara Falls, Ont. on October 14, 1980; the second section contains the notes from the Susitna Hydroelectric Project APA Review Meeting held in Buffalo, N.Y. on October 15, 1980. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |v Congresses. |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |v Congresses. | |
710 | 2 | |a Susitna Hydroelectric Project. |b APA Review Meeting |d (1980 : |c Buffalo, N.Y.) | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1387. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1387.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01387 |