Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative.
"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative Subtask 6.02, Closeout report, investigate tunnel alternative Investigate tunnel alternative |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Acres American Incorporated. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1279 |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1279. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Summary
- Scope of work
- Conceptual tunnel schemes
- Tunnel design and construction considerations
- Screening of conceptual tunnel schemes
- Preferred tunnel scheme
- Comparison with Devil Canyon dam scheme
- Conclusions and recommendations.