Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative.

"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative

Subtask 6.02, Closeout report, investigate tunnel alternative

Investigate tunnel alternative
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 1279
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1279.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary
  • Scope of work
  • Conceptual tunnel schemes
  • Tunnel design and construction considerations
  • Screening of conceptual tunnel schemes
  • Preferred tunnel scheme
  • Comparison with Devil Canyon dam scheme
  • Conclusions and recommendations.