Study of fish passage barriers, Implementation plan /
Construction and operation of the Susitna-Watana Hydroelectric Project will result in ecological habitat changes. The goal of this study is to evaluate the potential effects of Project-induced changes in flow and water surface elevation on free access of fish into, within, and out of suitable habita...
Saved in:
Additional Author(s): | Bose, Kimberly D., Dyok, Wayne. |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. HDR, Inc. Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03867cam a2200601Ia 4500 | ||
---|---|---|---|
001 | 2018365 | ||
003 | SIRSI | ||
005 | 20140212011204.0 | ||
007 | cr cn||||a|||| | ||
008 | 140212s2013 akuab b s000 0 eng d | ||
035 | |a (OCoLC)870340505 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 200 sec. 9.12a | |
088 | |a SuWa 200 | ||
245 | 0 | 0 | |a Study of fish passage barriers, Implementation plan / |c prepared for Alaska Energy Authority ; prepared by HDR, Inc. |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a 62 p. in various pagings : |b col. ill., col. maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200 | |
500 | |a Title from title page of attachment 1. | ||
500 | |a Includes cover letter to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority, dated June 17, 2013, with the subject line: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Study of fish passage barriers implementation plan. | ||
500 | |a This study plan document comprises a cover letter and two attachments. | ||
500 | |a "June 2013." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 200. | ||
530 | |a Available also in electronic format on the Internet. | ||
513 | |a Final study plan. | ||
510 | 3 | |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. | |
500 | |a Section 9.12a of the Final study plan. | ||
520 | |a Construction and operation of the Susitna-Watana Hydroelectric Project will result in ecological habitat changes. The goal of this study is to evaluate the potential effects of Project-induced changes in flow and water surface elevation on free access of fish into, within, and out of suitable habitats in the upper Susitna River (inundation zone above the Watana Dam site) and the middle Susitna River (Watana Dam site to the confluence of Chulitna and Talkeetna rivers). | ||
505 | 0 | |a Cover letter -- Attachment 1. Study of fish passage barrier implementation plan (June 2013) -- Attachment 2. Alaska Energy Authority response to the June 7, 2013 joint comments of National Marine Fisheries Service and U.S. Fish and Wildlife Service on the study of the fish passage barriers implementation plan. | |
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Fishes |x Habitat |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Fishes |x Migration |x Research |z Alaska |z Susitna River. | |
710 | 2 | |a Alaska Energy Authority. | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
700 | 1 | |a Bose, Kimberly D., |e addressee. | |
700 | 1 | |a Dyok, Wayne. | |
710 | 2 | |a HDR, Inc. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
740 | 0 | 2 | |a Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Study of fish passage barriers implementation plan. |
740 | 0 | 2 | |a Study of fish passage barrier implementation plan (June 2013) |
740 | 0 | 2 | |a Alaska Energy Authority response to the June 7, 2013 joint comments of National Marine Fisheries Service and U.S. Fish and Wildlife Service on the study of the fish passage barriers implementation plan. |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec9-12a.pdf |3 Direct link to this section. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html |3 List of related Final Study Plans. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
098 | |a SuWa 00200 | ||
596 | |a 9 10 |