Subsistence resources study, Study plan Section 14.5, Final study plan /

A study is described to collect baseline data on subsistence harvesting and to document traditional and contemporary subsistence use within or near the Susitna-Watana Hydroelectric Project area. Information will be collected through surveys, subsistence mapping interviews, and traditional local know...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Subsistence resources study 14.5
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:A study is described to collect baseline data on subsistence harvesting and to document traditional and contemporary subsistence use within or near the Susitna-Watana Hydroelectric Project area. Information will be collected through surveys, subsistence mapping interviews, and traditional local knowledge interviews.
Physical Description:65 p. in various pagings : col. maps, forms ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.

Sections 14.5 (main report) and 14.5a (attachments) of the Final study plan.
Report Type:Final study plan.
Bibliography:Includes bibliographical references.