Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Submission of final intercept and mail survey instruments, recreation resources study (RSP 12.5).

Saved in:
Bibliographic Details
Alternate Title:Submission of final intercept and mail survey instruments, recreation resources study (RSP 12.5)
Additional Author(s):McGregor, Betsy.

Bose, Kimberly D.,
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:53 p. in various pagings : col. ill., col. maps, forms ; 28 cm.
Notes:Title from subject line of cover letter.

Includes cover letter to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Betsy McGregor, Environmental Manager, Alaska Energy Authority, dated April 15, 2013.

ARLIS assigned report number: SuWa 200.

Section 12.5a of the Final study plan.

Attachment 4 comprises a survey called "2013 Alaska recreation survey", which is a different version than the one called "Alaska recreation survey 2013" and numbered 74 in the series Susitna-Watana Hydroelectric Project document.
Report Type:Final study plan.