Ebasco estimating package. Revision 4 /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Ebasco estimating package. Revision 4 |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1359 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1359. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02120cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 1992625 | ||
003 | SIRSI | ||
005 | 20140106031754.0 | ||
007 | cr bn||||a|||| | ||
008 | 140106s1982 aku 000 0 eng d | ||
035 | |a (OCoLC)867574336 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1359 | |
088 | |a APA 1359 | ||
245 | 0 | 0 | |a Ebasco estimating package. |n Revision 4 / |c prepared by Acres. |
246 | 3 | |a Susitna Hydroelectric Project. |p Ebasco estimating package. |n Revision 4 | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 103 p. in various pagings ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a Title from cover. | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "February 12, 1982." | ||
500 | |a The original "Ebasco estimating package" document was released November 20, 1981 (APA 1356). Four updated reports followed. Although each update is called "revision", the contents (text, charts, tables, and illustrations) differ substantially beyond a mere revision of corresponding data. | ||
510 | 3 | |a Assigned APA Document no. 1359 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |x Costs. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |x Costs. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1359. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1359.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01359 |