1982-84 geotechnical program. Subtask 5.07 report /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. 1982-84 geotechnical program. Subtask 5.07 report

Subtask 5.07 report

Alaska Power Authority, Susitna Hydroelectric Project. Design level geotechnical investigation program
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Acres American Incorporated.

Alaska Power Authority.
Publisher:Acres American Incorporated,
Report Numbers:APA 62

APA 1265
Edition:Draft.
Series:Document (Susitna Hydroelectric Project) ; no. 62.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02216cam a2200505Ia 4500
001 1989488
003 SIRSI
005 20131217092157.0
007 cr bn||||a||||
008 131217s1981 akuab t 000 0 eng d
035 |a (OCoLC)865507743 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 62 
088 |a APA 62 
088 |a APA 1265 
245 0 0 |a 1982-84 geotechnical program.  |n Subtask 5.07 report /  |c prepared by Acres. 
246 3 |a Susitna Hydroelectric Project.  |p 1982-84 geotechnical program.  |n Subtask 5.07 report 
246 3 0 |a Subtask 5.07 report 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Design level geotechnical investigation program 
250 |a Draft. 
260 |a [Buffalo, New York] :  |b Acres American Incorporated,  |c [1981?] 
300 |a [90] p. :  |b ill., maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 62 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a Series statement from label on cover (on some copies only). 
510 3 |a Assigned APA Document no. 62 in the Susitna Hydroelectric Project document index. Also assigned no. 1265 (duplicate entry). 
530 |a Available also in electronic format on the Internet. 
650 0 |a Dams  |x Design and construction  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Research  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 62. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA62.pdf  |z ARLIS Document Server 
856 4 8 |u https://www.arlis.org/docs/vol1/Susitna/0/APA62label.pdf  |z Alternative cover (with Harza-Ebasco series label).  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00062 
098 |a APA 01265