2012 review of existing water temperature model results and data collection.

As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are needed on how construction and operation will affect flow regimes and water temperature downstream of the dam. This study plan outlines the objective...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on Project's Document webpage: Review of existing water temperature model results data collection study plan
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 96
Series:Susitna-Watana Hydroelectric Project document ; no. 96.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are needed on how construction and operation will affect flow regimes and water temperature downstream of the dam. This study plan outlines the objectives and methods for reviewing historical 1980s modeling results and collecting meterological and stream termperature data that will serve as a basis for the 2013 and 2014 formal FERC licensing studies.
Physical Description:15, 3 p. : 1 col. ill., 2 col. maps, 2 forms ; 28 cm.
Notes:Caption title.

"Susitna-Watana Hydroelectric Project"--Page header.

"Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority"--Page footer.

"May 2, 2012"--Page footer.

ARLIS assigned report number: SuWa 96.
Report Type:2012 environmental study plans.
Bibliography:Includes bibliographical references (p. 14-15).