2012 river flow routing model data collection.
As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are required. This study plan describes data collection during 2012 for developing a river flow routing model. The model will cover the reach between Riv...
Saved in:
Alternate Title: | Title on Project's Document webpage: River flow routing model data collection study plan |
---|---|
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 99 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 99. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are required. This study plan describes data collection during 2012 for developing a river flow routing model. The model will cover the reach between River Mile 75 and the proposed dam at River Mile 184. |
---|---|
Physical Description: | 11, 4 p. : col. maps, col. charts ; 28 cm. |
Notes: | Title from caption. "Susitna-Watana Hydroelectric Project"--Page header. "Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority"--Page footer. "May 2, 2012"--Page footer. ARLIS assigned report number: SuWa 99. |
Report Type: | 2012 environmental study plans. |
Bibliography: | Includes bibliographical references (p. 11). |