2012 river flow routing model data collection.

As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are required. This study plan describes data collection during 2012 for developing a river flow routing model. The model will cover the reach between Riv...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on Project's Document webpage: River flow routing model data collection study plan
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 99
Series:Susitna-Watana Hydroelectric Project document ; no. 99.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:As part of the Alaska Energy Authority's license application submitted to FERC for the proposed Susitna-Watana Hydroelectric Project, studies are required. This study plan describes data collection during 2012 for developing a river flow routing model. The model will cover the reach between River Mile 75 and the proposed dam at River Mile 184.
Physical Description:11, 4 p. : col. maps, col. charts ; 28 cm.
Notes:Title from caption.

"Susitna-Watana Hydroelectric Project"--Page header.

"Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority"--Page footer.

"May 2, 2012"--Page footer.

ARLIS assigned report number: SuWa 99.
Report Type:2012 environmental study plans.
Bibliography:Includes bibliographical references (p. 11).