The Alaska Energy Authority is preparing a license application for the Susitna-Watana Hydroelectric Project. Construction and operation of the project would affect wetlands upstream and downstream of the dam site, along access routes, and along transmission lines. Fill in wetlands would occur only u...

Full description

Saved in:
Bibliographic Details
Alternate Title:Wetlands mapping study plan - 2012

2012 wetlands mapping study - May 18, 2012

Title on Project's Document webpage: Wetland mapping study plan
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 106
Series:Susitna-Watana Hydroelectric Project document ; no. 106.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:The Alaska Energy Authority is preparing a license application for the Susitna-Watana Hydroelectric Project. Construction and operation of the project would affect wetlands upstream and downstream of the dam site, along access routes, and along transmission lines. Fill in wetlands would occur only upstream of the dam site and along those corridors, hence the mapping of wetlands is proposed only for those areas. This study plan outlines the objectives and methods for characterizing existing wetlands in the project area.
Physical Description:10 p. : col. map ; 28 cm.
Notes:At head of title: Susitna-Watana Hydroelectric Project (FERC No. 14241).

"May 2012."

"Susitna-Watana Hydroelectric Project"--Page header.

ARLIS assigned report number: SuWa 106.
Report Type:2012 environmental study plans.
Bibliography:Includes bibliographical references (p. 8-9).