Scoping document 2, Susitna-Watana Hydroelectric Project, FERC Project no. P-14241-000.
Scoping Document 2 is intended to advise all participants of the proposed scope of the environmental impact statement (EIS) based on the written and verbal comments received during the scoping period. This document contains a brief description of: (1) the scoping process and schedule for the develop...
Saved in:
Corporate Author: | |
---|---|
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Office of Energy Projects, United States. Division of Hydropower Licensing, |
Publisher: | Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing, |
Report Numbers: | SuWa 85 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 85. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03391cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 1978639 | ||
003 | SIRSI | ||
005 | 20131031113021.0 | ||
007 | cr cn||||a|||| | ||
008 | 131014s2012 dcub b f000 0 eng d | ||
035 | |a (OCoLC)860726180 | ||
040 | |a RLA |c RLA |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 85 | |
088 | |a SuWa 85 | ||
110 | 1 | |a United States. |b Federal Energy Regulatory Commission, |e author. | |
245 | 1 | 0 | |a Scoping document 2, Susitna-Watana Hydroelectric Project, FERC Project no. P-14241-000. |
260 | |a Washington, D.C. : |b Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing, |c [2012] | ||
300 | |a 2, iii, 70 p. : |b map ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 85 | |
500 | |a This scoping document represents a statement from the Federal Energy Regulatory Commission (as named in the document on p. 1 and 56). | ||
500 | |a Includes introduction letter from the Federal Energy Regulatory Commission, Office of Energy Projects dated July 16, 2012 with the subject line: Scoping document 2 for the Susitna-Watana Hydroelectric Project. | ||
500 | |a "July 2012." | ||
500 | |a ARLIS assigned report number: SuWa 85. | ||
513 | |a Federal Energy Regulatory Commission (FERC) documents. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Federal Energy Regulatory Commission (FERC) documents. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Scoping Document 2 is intended to advise all participants of the proposed scope of the environmental impact statement (EIS) based on the written and verbal comments received during the scoping period. This document contains a brief description of: (1) the scoping process and schedule for the development of the EIS; (2) the proposed action(s) and reasonable alternatives identified to date; (3) preliminary identification of environmental issues and proposed studies; (4) a proposed EIS outline; and (5) a preliminary list of comprehensive plans that are applicable to the proposed project. | ||
505 | 0 | |a Introduction -- Scoping -- Proposed action and alternatives -- Scope of cumulative effects and site-specific resource issues -- Proposed studies -- EIS preparation schedule -- Proposed EIS outline -- Consistency with comprehensive plans -- Mailing list -- appendix A. Process plan and schedule -- appendix B. Entities that filed written comments. | |
504 | |a Includes bibliographical references (p. 55-56). | ||
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. |b Office of Energy Projects, |e writer of supplementary textual content. | |
710 | 1 | |a United States. |b Division of Hydropower Licensing, |e issuing body. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 85. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa85.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SuWa 00085 |