Wetland mapping study in the upper and middle Susitna basin /

The goals of the wetland mapping study are to prepare a baseline map of existing wetland habitats in the upper and middle Susitna basin (upstream of Gold Creek) that could be directly affected by Project development, and to determine the functions that each mapped wetland type performs. This mapping...

Full description

Saved in:
Bibliographic Details
Alternate Title:Wetland mapping
Corporate Contributor(s):ABR, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 35
Series:Susitna-Watana Hydroelectric Project document ; no. 35.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02936cam a2200493Ia 4500
001 1977320
003 SIRSI
005 20131107083448.0
007 cr cn||||a||||
008 131008s2013 akuab bt s000 0 eng d
035 |a (OCoLC)859611854 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 35 
088 |a SuWa 35 
245 0 0 |a Wetland mapping study in the upper and middle Susitna basin /  |c prepared for Alaska Energy Authority ; prepared by ABR, Inc.--Environmental Research & Services. 
246 1 7 |a Wetland mapping 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2013] 
300 |a iv, 22 p. :  |b col. ill., col. map ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 35 
500 |a At head of title: Susitna-Watana Hydroelectric Project (FERC No. 14241). 
513 |a Final report. 
500 |a "February 2013." 
500 |a ARLIS assigned report number: SuWa 35. 
513 |a 2012 environmental studies. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: 2012 environmental studies. 
530 |a Available also in electronic format on the Internet. 
520 |a The goals of the wetland mapping study are to prepare a baseline map of existing wetland habitats in the upper and middle Susitna basin (upstream of Gold Creek) that could be directly affected by Project development, and to determine the functions that each mapped wetland type performs. This mapping information will be used in AEA's license application to assess impacts to wetland resources from the proposed Project, and to develop protection, mitigation, and enhancement measures. The wetland mapping study will provide the baseline information necessary for preparing a wetland permit application for the Project under Section 404 of the Clean Water Act. The study area consists of a two-mile buffer surrounding areas that would be disturbed by development, including the dam site, the inundation area, supporting infrastructure near the dam site, and alternative road and transmission lines. 
505 0 |a Summary -- Introduction -- Study objectives -- Study area -- Methods -- Results -- Discussion -- Tables -- Figures. 
504 |a Includes bibliographical references (p. 10-11). 
650 0 |a Wetland mapping  |z Alaska  |z Susitna River Region. 
650 0 |a Habitat (Ecology)  |z Alaska  |z Susitna River Region. 
710 2 |a ABR, Inc. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 35. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa35.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00035