Draft Susitna River productivity study implementation plan /

The overarching goal of the river productivity study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g. temperature, substrate, water quality), and benthic macroinvertebrate and algal communities in the middle...

Full description

Saved in:
Bibliographic Details
Alternate Title:Copy for the January 31, 2013 (SuWa 26) filing has cover title: Attachment D, Draft Susitna River productivity study implementation plan (January 2013)

River productivity study implementation plan
Corporate Contributor(s):R2 Resource Consultants.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 26

SuWa 205
Series:Susitna-Watana Hydroelectric Project document ; no. 26.
Susitna-Watana Hydroelectric Project document ; no. 205.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Methods
  • Schedule
  • Field equipment list
  • Tables
  • Figures
  • Appendices.