Draft Susitna River productivity study implementation plan /
The overarching goal of the river productivity study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g. temperature, substrate, water quality), and benthic macroinvertebrate and algal communities in the middle...
Saved in:
Alternate Title: | Copy for the January 31, 2013 (SuWa 26) filing has cover title: Attachment D, Draft Susitna River productivity study implementation plan (January 2013) River productivity study implementation plan |
---|---|
Corporate Contributor(s): | R2 Resource Consultants. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 26 SuWa 205 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 26. Susitna-Watana Hydroelectric Project document ; no. 205. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Methods
- Schedule
- Field equipment list
- Tables
- Figures
- Appendices.