Open water HEC-RAS flow routing model /
The foundation of the Instream Flow Study (IFS) analyses rests with the development of the Susitna River Mainstem Flow Routing Models (HEC-RAS and Ice Processes Model) that will provide hourly flow and water surface elevation data at numerous locations longitudinally distributed throughout the lengt...
Saved in:
Alternate Title: | Copy for March 01, 2013 filing (SuWa 23) has cover title: Attachment A, Open water HEC-RAS flow routing model (January 2013) Open water flow routing model |
---|---|
Corporate Contributor(s): | R2 Resource Consultants. Geo-Watershed Scientific (Firm) Brailey Hydrologic (Firm) Geovera (Firm) Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 23 SuWa 47 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 23. Susitna-Watana Hydroelectric Project document ; no. 47. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04076cam a2200649Ia 4500 | ||
---|---|---|---|
001 | 1977216 | ||
003 | SIRSI | ||
005 | 20131008040711.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 131007s2013 akuabd bt s000 0 eng d | ||
035 | |a (OCoLC)859531121 | ||
040 | |a RLA |c RLA |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 23 | |
050 | 4 | |a TK1425.S8 |b S92 no. 47 | |
088 | |a SuWa 23 | ||
088 | |a SuWa 47 | ||
245 | 0 | 0 | |a Open water HEC-RAS flow routing model / |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc., GW Scientific, Brailey Hydrologic, Geovera. |
246 | 1 | |i Copy for March 01, 2013 filing (SuWa 23) has cover title: |a Attachment A, Open water HEC-RAS flow routing model (January 2013) | |
246 | 1 | 7 | |a Open water flow routing model |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a 234 in various pagings : |b col. ill., col. maps, col. charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 23, 47 | |
500 | |a "January 2013." | ||
500 | |a ARLIS assigned report number: SuWa 23 (for the March 01, 2013 filing category). | ||
500 | |a ARLIS assigned report number: SuWa 47 (for the 2012 environmental studies category). | ||
500 | |a The document SuWa 23 is an attachment to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 (SuWa 22). | ||
513 | |a March 01, 2013 filing. | ||
513 | |a 2012 environmental studies. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the categories: March 01, 2013 filing; and, 2012 environmental studies. | |
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a Introduction and study goals -- Project setting -- Summary of existing information -- Methods -- Results -- Future improvements to the model -- appendix 1. WR-S1 reservoir and river flow routing model transect data collection study. | |
520 | |a The foundation of the Instream Flow Study (IFS) analyses rests with the development of the Susitna River Mainstem Flow Routing Models (HEC-RAS and Ice Processes Model) that will provide hourly flow and water surface elevation data at numerous locations longitudinally distributed throughout the length of the river downstream of the proposed dam site. The robust performance and flexibility of HEC-RAS make this model an appropriate choice for routing stage fluctuations downstream from the proposed Project dam under open-water conditions (i.e. summer, ice-free). | ||
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Instream flow |z Alaska |z Susitna River |x Computer simulation. | |
650 | 0 | |a Streamflow |z Alaska |z Susitna River |x Computer simulation. | |
650 | 0 | |a Water levels |z Alaska |z Susitna River |x Computer simulation. | |
710 | 2 | |a R2 Resource Consultants. | |
710 | 2 | |a Geo-Watershed Scientific (Firm) | |
710 | 2 | |a Brailey Hydrologic (Firm) | |
710 | 2 | |a Geovera (Firm) | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Alaska Energy Authority. | |
787 | 0 | 8 | |i Attachment to: |a Dyok, Wayne. |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000. |d [Anchorage : Alaska Energy Authority, 2013] |w (OCoLC)859531215 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 23. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 47. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa23.pdf |3 Direct link to report for the March 01, 2013 filing. |z ARLIS Document Server |
098 | |a SuWa 00023 | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa47.pdf |3 Direct link to report for the 2012 environmental studies. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa22.html |3 List of all reports filed under the cover letter of January 31, 2013 (SuWa 22 filing letter). |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00047 |