Reconnaissance level assessment of potential channel change in the lower Susitna River segment : 2012 study technical memorandum /

The specific objective of the effort presented in this technical memorandum is to perform an initial assessment of anticipated Project effects on the lower Susitna River segment channel type and morphology. The assessment was performed using the data developed for the pre- and post-Project flood fre...

Full description

Saved in:
Bibliographic Details
Alternate Title:Copy for the March 01, 2013 filing (SuWa 12) has cover title: Attachment F, Technical memorandum, Reconnaissance level assessment of potential channel change in the lower Susitna River segment (February 2013)

Technical memorandum, Reconnaissance level assessment of potential channel change in the lower Susitna River segment (February 2013)

Potential channel change/lower Susitna
Corporate Contributor(s):Tetra Tech, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 12

SuWa 45
Series:Susitna-Watana Hydroelectric Project document ; no. 12.
Susitna-Watana Hydroelectric Project document ; no. 45.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04716cam a2200661Ia 4500
001 1976967
007 ta
003 SIRSI
005 20131008100313.0
007 cr cn||||a||||
008 131002s2013 akubd b s000 0 eng d
035 |a (OCoLC)859275936 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 12 
050 4 |a TK1425.S8  |b S92 no. 45 
088 |a SuWa 12 
088 |a SuWa 45 
245 0 0 |a Reconnaissance level assessment of potential channel change in the lower Susitna River segment :  |b 2012 study technical memorandum /  |c prepared for Alaska Energy Authority ; prepared by Tetra Tech. 
246 1 |i Copy for the March 01, 2013 filing (SuWa 12) has cover title:  |a Attachment F, Technical memorandum, Reconnaissance level assessment of potential channel change in the lower Susitna River segment (February 2013) 
246 3 |a Technical memorandum, Reconnaissance level assessment of potential channel change in the lower Susitna River segment (February 2013) 
246 1 7 |a Potential channel change/lower Susitna 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2013] 
300 |a iv, 26 p. :  |b 1 col. map, col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 12, 45 
500 |a At head of title: Susitna-Watana Hydroelectric Project (FERC No. 14241). 
500 |a "2012 Study technical memorandum." 
500 |a "February 2013." 
500 |a ARLIS assigned report number: SuWa 12 (for the March 01, 2013 filing category). 
500 |a ARLIS assigned report number: SuWa 45 (for the 2012 environmental studies category). 
500 |a The document SuWa 12 is an attachment to: Susitna-Watana Hydroelectric Project, FERC project no. 14241-000; filing of 2012 baseline environmental and resources study reports (SuWa 6). 
513 |a 2012 study technical memorandum. 
513 |a March 01, 2013 filing. 
513 |a 2012 environmental studies. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the categories: March 01, 2013 filing; and, 2012 environmental studies. 
530 |a Available also in electronic format on the Internet. 
650 0 |a Streamflow  |z Alaska  |z Susitna River. 
520 |a The specific objective of the effort presented in this technical memorandum is to perform an initial assessment of anticipated Project effects on the lower Susitna River segment channel type and morphology. The assessment was performed using the data developed for the pre- and post-Project flood frequency, flow duration, and sediment load analyses to predict the geomorphic response of the Susitna River in an analytic framework proposed by Grant et al. (2003) along the longitudinal profile of the river system from the middle Susitna River segment downstream through the lower Susitna River segment, with particular emphasis on the effects of the Chulitna and Talkeetna rivers at and downstream from the Three Rivers Confluence. This work performed for this technical memorandum integrates the results of several earlier tasks in the 2012 Reconnaissance-Level Geomorphic and Aquatic Habitat Assessment of Project Effects on Lower River Channel Study. 
505 0 |a Summary -- Introduction -- Study objectives -- Study area -- Methods -- Results -- Summary and conclusions. 
504 |a Includes bibliographical references (p. 13-14). 
650 0 |a Sediment transport  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Channels. 
710 2 |a Tetra Tech, Inc. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
787 0 8 |i Attachment to:  |a Dyok, Wayne.  |t Susitna-Watana Hydroelectric Project, FERC project no. 14241-000; filing of 2012 baseline environmental and resources study reports.  |d [Anchorage : Alaska Energy Authority, 2013]  |w (OCoLC)859214701 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 12. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 45. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa12.pdf  |3 Direct link to report for the March 01, 2013 filing.  |z ARLIS Document Server 
098 |a SuWa 00012 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa45.pdf  |3 Direct link to report for the 2012 environmental studies.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa6.html  |3 List of related reports for the March 01, 2013 filing (SuWa 6 filing letter).  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00045