Lower Susitna River sedimentation study, project effects on suspended sediment concentration /
The concentrations and particle size distributions of suspended sediment were determined for natural conditions at various locations on the Susitna River based on the data collected by the United States Geological Survey. Using project conditions, the concentrations were estimated for reservoir rele...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Lower Susitna River sedimentation study, project effects on suspended sediment concentration |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | SUS 355 |
Edition: | [Draft]. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02357cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 1969904 | ||
003 | SIRSI | ||
005 | 20140530043836.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
007 | he bmu---bbca | ||
008 | 130917s1984 akua bt 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)858452006 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S9 no. 355 | |
088 | |a SUS 355 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Lower Susitna River sedimentation study, project effects on suspended sediment concentration / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Lower Susitna River sedimentation study, project effects on suspended sediment concentration | |
336 | |a text |b txt |2 rdacontent | ||
250 | |a [Draft]. | ||
260 | |a Anchorage, Alaska : |b Harza-Ebasco Susitna Joint Venture, |c [1984] | ||
300 | |a iii, 11, [16] p. : |b ill. ; |c 28 cm. | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
513 | |a Draft report. | ||
500 | |a "June 1984." | ||
510 | 3 | |a Assigned SUS document no. 355 in the Susitna Aquatic Impact Assessment Project bibliography. | |
500 | |a Exhibit 1, listed in the table of contents, is not available. The frame for that page in the master microfiche is a blank page. | ||
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a The concentrations and particle size distributions of suspended sediment were determined for natural conditions at various locations on the Susitna River based on the data collected by the United States Geological Survey. Using project conditions, the concentrations were estimated for reservoir releases at Gold Creek and Sunshine. | ||
504 | |a Includes bibliographical references (p. 11). | ||
650 | 0 | |a River sediments |z Alaska |z Susitna River. | |
650 | 0 | |a Suspended sediments |z Alaska |z Susitna River. | |
650 | 0 | |a Sediment transport |z Alaska |z Susitna River. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
901 | |a 3755 |c orig | ||
710 | 2 | |a Susitna Hydroelectric Project. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/SUS/3/SUS355.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SUS 00355 |