Phase II final report. Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features. Volume I /

Historical Research Associates was under contract to conduct a two-phase effort to develop and test a model to predict the occurrence and density of cultural resources that may occur in the linear feature corridors (transmission lines, access railroad, and automobile access road) of the proposed Sus...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Phase II final report. Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features. Volume I

Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features. Volume I
Additional Author(s):Greiser, T. Weber.
Corporate Contributor(s):Alaska Heritage Research Group.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Historical Research Associates.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 3408
Series:Document (Susitna Hydroelectric Project) ; no. 3408.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03203cam a2200601Ia 4500
001 1456283
003 SIRSI
005 20140613024204.0
007 ta
007 he bmu---bbca
007 cr bn||||a||||
008 120719s1986 akuab bt s000 0 eng d
040 |a RLA  |c RLA  |d OCLCA  |d RLA 
035 |a (OCoLC)800770802 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F472 no. 3408 
050 4 |a TK1425.S9  |b D63 no. 3408 
088 |a APA 3408 
049 |a RLAA 
245 0 0 |a Phase II final report. Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features.  |n Volume I /  |c report by Historical Research Associates with contributions from Alaska Heritage Research Group Inc. ; T. Weber Greiser, project manager, ... [et al.] ; under contract to Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Phase II final report. Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features.  |n Volume I 
246 3 0 |a Sample survey and predictive model refinement for cultural resources located along the Susitna Hydroelectric Project linear features.  |n Volume I 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1986] 
300 |a 99 p. in various pagings :  |b ill., maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Document ;  |v no. 3408 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Final report. 
500 |a "June 1986." 
500 |a "Susitna file no. 4.4.6." 
500 |a "Federal Energy Regulatory Commission, Project No. 7114"--Cover. 
510 3 |a Assigned APA document no. 3408 in Susitna Hydroelectric Project document index. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a Historical Research Associates was under contract to conduct a two-phase effort to develop and test a model to predict the occurrence and density of cultural resources that may occur in the linear feature corridors (transmission lines, access railroad, and automobile access road) of the proposed Susitna Hydroelectric Project. 
504 |a Includes bibliographical references (p. 6-1 to 6-9). 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Archaeological surveying  |z Alaska  |z Susitna River Valley. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska. 
650 0 |a Dams  |x Environmental aspects  |z Alaska. 
700 1 |a Greiser, T. Weber. 
710 2 |a Alaska Heritage Research Group. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Historical Research Associates. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3408. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/34/APA3408.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 03408