Draft summary of environmental report, Task 2, Surveys and site facilities /
Saved in:
Alternate Title: | Task 2, Surveys and site facilities. Draft summary of environmental report. Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities. Subtask 2.10, Access road Alaska Power Authority, Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Public Participation Office. Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1210 SUS 80 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1210. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03833cam a2200757Ia 4500 | ||
---|---|---|---|
001 | 1095154 | ||
003 | SIRSI | ||
005 | 20160607014348.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr bn||||a|||| | ||
008 | 970327s1981 akuk t s000 0 eng d | ||
040 | |a WaOLN |b eng |c W7L |d RLA |d OCLCF |d OCLCQ |d OCLCO |d RLA | ||
035 | |a (OCoLC)43024169 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1210 | |
088 | |a APA 1210 | ||
088 | |a SUS 80 | ||
049 | |a RLAA | ||
130 | 0 | |a Task 2, Surveys and site facilities. |p Draft summary of environmental report. | |
245 | 1 | 0 | |a Draft summary of environmental report, Task 2, Surveys and site facilities / |c Acres American Incorporated. |
300 | |a 8, 28, [3] pages : |b forms ; |c 28 cm | ||
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Draft summary of environmental report, Task 2, Surveys and site facilities. |n Subtask 2.10, |p Access road |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Draft summary of environmental report, Task 2, Surveys and site facilities | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1981] | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "September 1981"--Cover. | ||
500 | |a "October 1981." | ||
500 | |a The final three pages (following p. 28) are numbered 36, 37, and 39. | ||
500 | |a The second section is a report on workshops and questionnaires and is called: Access report / Alaska Power Authority, Public Participation Office. October 9, 1981. Pages 29-35 and 38 are not included. | ||
510 | 3 | |a Assigned APA Document no. 1210 in the Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned number SUS 80 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
650 | 0 | |a Highway planning |z Alaska |z Susitna River Region. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Public opinion. |
650 | 0 | |a Highway planning |z Alaska |z Susitna River Region |x Public opinion. | |
650 | 0 | |a Transportation |z Alaska |z Susitna River Region |x Planning. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 4 | |a Dams |x Access roads |z Alaska |z Susitna River Region |x Planning. | |
650 | 4 | |a Dams |x Access roads |z Alaska |z Susitna River Region |x Public opinion. | |
650 | 4 | |a Access roads |z Alaska |z Susitna River Region |x Planning. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Dams |x Environmental aspects. |2 fast |0 (OCoLC)fst00887340 | |
650 | 7 | |a Highway planning. |2 fast |0 (OCoLC)fst00956692 | |
650 | 7 | |a Highway planning |x Public opinion. |2 fast |0 (OCoLC)fst00956713 | |
650 | 7 | |a Hydroelectric power plants |x Environmental aspects. |2 fast |0 (OCoLC)fst00964942 | |
650 | 7 | |a Planning. |2 fast |0 (OCoLC)fst01065224 | |
650 | 7 | |a Public opinion. |2 fast |0 (OCoLC)fst01082785 | |
650 | 7 | |a Transportation |x Planning. |2 fast |0 (OCoLC)fst01155146 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
651 | 7 | |a Alaska |z Susitna River Valley. |2 fast |0 (OCoLC)fst01273501 | |
710 | 2 | |a Alaska Power Authority. |b Public Participation Office. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
740 | 0 | 2 | |a Access report. |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1210. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1210.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SUS 00080 | ||
098 | |a APA 01210 |