Board packet, October 14, 1983 (not including appendices), board meeting /

This document comprises the papers of the Alaska Power Authority board meeting held Oct. 14, 1983 in Anchorage, which included a two-hour teleconference session for public comment. It contains a background report on the Harza-Ebasco Susitna Joint Venture's contracted economic forecasting and de...

Full description

Saved in:
Bibliographic Details
Alternate Title:Board meeting, board packet, October 14, 1983 (not including appendices)
Corporate Author: Alaska Power Authority.
Corporate Contributor(s):Susitna Hydroelectric Project.
Publisher:[Alaska Power Authority],
Report Numbers:SUS 236
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02669cam a2200457Ia 4500
001 1088407
003 SIRSI
005 20160607014346.0
007 ta
007 he bmb|||b|ca
007 cr bn||||a||||
008 060906s1983 aku s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)71261401 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S9 no. 236 
088 |a SUS 236 
049 |a RLAA 
110 2 |a Alaska Power Authority. 
245 1 0 |a Board packet, October 14, 1983 (not including appendices), board meeting /  |c Alaska Power Authority. 
246 3 |a Board meeting, board packet, October 14, 1983 (not including appendices) 
260 |a [Anchorage, Alaska] :  |b [Alaska Power Authority],  |c [1983] 
300 |a [5], 9, [16] pages ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cover title. 
510 3 |a Assigned number SUS 236 in the Susitna Aquatic Impact Assessment Project bibliography. 
500 |a Includes three-page report dated October 13, 1983 with caption title: Susitna Hydroelectric Project, background information, economic update and design modifications. 
530 |a Available also in microfiche format and electronic format on the Internet. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction. 
520 |a This document comprises the papers of the Alaska Power Authority board meeting held Oct. 14, 1983 in Anchorage, which included a two-hour teleconference session for public comment. It contains a background report on the Harza-Ebasco Susitna Joint Venture's contracted economic forecasting and design refinement projects, the Oct. 14 meeting agenda, minutes of the Sept. 26 Board of Directors meeting, the meeting sign-in sheets, and partial minutes of the Oct. 14 meeting. The Oct. 14 minutes included here are for agenda item III (Project refinements; Project updates; FY 1984 budget; FY 1985 budget; Review of Susitna access road) and item IV (Consideration of action with respect to the balance of the Alaska Power Authority budget for FY 1985). 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |x Economic aspects  |z Alaska  |z Susitna River. 
655 0 |a Public meetings  |z Alaska. 
655 0 |a Business meetings  |z Alaska. 
710 2 |a Susitna Hydroelectric Project. 
740 0 2 |a Susitna Hydroelectric Project.  |p Background information, economic update and design modifications. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/2/SUS236.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a SUS 00236