Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000;
Third Set of 2014 Technical Memoranda for Initial Study Plan Meetings


Alaska Energy Authority
Susitna-Watana Hydroelectric Project

Published: Anchorage : Alaska Energy Authority, 2014.

September 2014.

Assigned SuWa numbers 247 to 253.

These reports (cover letter with 6 attachments) were prepared for Alaska Energy Authority for the Susitna-Watana Hydroelectric Project.


 

LINKS VIA ARLIS DOCUMENT SERVER:

SuWa NumberVolumeStudy Plan Number(s)Study Title
247Cover letter-- Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; third set of 2014 technical memoranda for Initial Study Plan meetings.

Title from subject line.

September 30, 2014

248Attachment A5.5, 5.6 Baseline water quality study (Study 5.5) and water quality modeling study (Study 5.6) : water quality and lower river modeling, technical memorandum
249Attachment B5.7 Mercury assessment and potential for bioaccumulation study (Study 5.7) : evaluation of continued mercury monitoring beyond 2014, technical memorandum

"(revised per errata November 14, 2014)"

Attachment B was revised in full by Attachment N to SuWa 268 (see pages 3-18 in that document).   ARLIS has updated SuWa 249 accordingly.

250Attachment C7.5 Groundwater study (Study 7.5) : preliminary groundwater and surface-water relationships in lateral aquatic habitats within focus areas FA-128 (Slough 8A) and FA-138 (Gold Creek) in the middle Susitna River, technical memorandum
  • [Main report]
  • Appendix A.   Hydrologic stations primary station purpose, location and data collection parameters
  • Appendix B.   April 2014 discharge measurements
  • Appendix C.   2014 groundwater study response analysis time-lapse image data at site ESSFA128-1

251Attachment D7.5 Groundwater study (Study 7.5) : groundwater and surface-water relationships in support of riparian vegetation modeling, technical memorandum
  • [Main report]
  • Appendix A.   Hydrologic stations primary station purpose, location and data collection parameters

252Attachment E9.7 Salmon escapement study (Study 9.7) : 2014 implementation and preliminary results, technical memorandum
253Attachment F9.17 Cook Inlet beluga whale study plan (Study 9.17) : 2015 implementation plan, technical memorandum