Published: Anchorage : Alaska Energy Authority, 2014.
September 2014.
Assigned SuWa numbers 239 to 246.
| SuWa Number | Volume | Study Plan Number | Study Title | 
| 239 | Cover letter | -- | Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; second set of 2014 technical memoranda for Initial Study Plan meetings. Title from subject line. September 26, 2014 | 
| 240 | Attachment A | 6.5 | Geomorphology study (Study 6.5) : updated mapping of aquatic macrohabitat types in the middle Susitna River segment from 1980s and current aerials, technical memorandum 
 | 
| 241 | Attachment B | 6.5 | Geomorphology study (Study 6.5) : Mapping of geomorphic features and turnover within the middle and lower Susitna River segments from 1950s, 1980s, and current aerials, technical memorandum 
 | 
| 242 | Attachment C | 6.6 | Fluvial geomorphology modeling below Watana Dam study (Study 6.6) : decision point on fluvial geomorphology modeling of the Susitna River below PRM 29.9, technical memorandum | 
| 243 | Attachment D | 6.6 | Fluvial geomorphology modeling below Watana Dam study (Study 6.6) : winter sampling of main channel bed material, technical memorandum | 
| 244 | Attachment E | 9.17 | Cook Inlet beluga whale study (Study 9.17) : 2014 Cook Inlet beluga whale prey study implementation, technical memorandum | 
| 245 | Attachment F | 9.8 | River productivity study (Study 9.8) : 2013 initial river productivity results, technical memorandum | 
| 246 | Attachment G | 9.8 | River productivity study (Study 9.8) : 2014 field season river productivity progress report, technical memorandum |