Donlin Gold Project, joint record of decision and permit evaluation, U.S. Army Corps of Engineers, Bureau of Land Management, Crooked Creek, AK.


Title on second page:   Joint record of decision and permit evaluation for the Donlin Gold Project.

Authors:   United States Army Corps of Engineers ; United States Bureau of Land Management

Publication:   [Washington, D.C.] : U.S. Department of the Interior, Bureau of Land Management, [2018]

August 13, 2018.

Physical description:   1 online resource (758 pages in various pagings) : color illustrations, color maps, plans


Notes:

This Record of Decision is also available at these websites:

Related documents
A list of related documents follows the Record of Decision below.



LINKS VIA ARLIS DOCUMENT SERVER



SECTIONCONTENTSFILE SIZE
Sections 1 to 7Introduction -- Summary of decision -- Proposed project -- Alternatives -- Public involvement -- Means to minimize, avoid, and mitigate adverse environmental impact -- Final agency decisions1 MB
Attachment A1 : Engineering Drawings (part 1)Engineering drawings
  • Drawing G001 - General notes and sheet index
  • Drawing G002 - Plan view overall project vicinity map
  • Drawings MA-200G through MA-203D1 - Mine area drawings
24 MB
Attachment A1 : Engineering Drawings (part 2)Engineering drawings
  • Drawings MA-203D2 through MA-214T - Mine area drawings
16 MB
Attachment A1 : Engineering Drawings (part 3) Engineering drawings
  • Drawings TA-300G through TA-316T - Transportation area drawings
13 MB
Attachment A1 : Engineering Drawings (part 4) Engineering drawings
  • Drawings PA-100G through PA-113A - Pipeline area maps
  • Airstrip and camp detail maps PA-102D1, PA-105D1, MA-106D1, MA-108D1
25.5 MB
Attachment A1 : Engineering Drawings (part 5) Engineering drawings
  • Drawings PA-130T through PA-177T - Pipeline area drawings
7 MB
Attachment A2 : Programmatic Agreement (part 1)NHPA Section 106 programmatic agreement
  • Cover through Appendix C3
521 KB
Attachment A2 : Programmatic Agreement (part 2)NHPA Section 106 programmatic agreement
  • Appendix D.   Cultural resources management plan. Revision 4.3 (cover through Exhibit D)

Note: Exhibit D is blank

4 MB
Attachment A2, Programmatic Agreement (part 3)NHPA Section 106 programmatic agreement
  • Appendix D.   Cultural resources management plan. Revision 4.3 (Exhibit E:   Meeting summary, Methods to avoid or minimize effects to Iditarod National Historical Trail : September 25, 2017)
  • Appendix E.   Reserved - Amendments

Note: Appendix E is blank

3 MB
Attachments B1-B4
  • Attachment B1.   Response to comments on special Public Notice (SPN-1995-120)
  • Attachment B2.   Evaluation of the discharge of dredge and fill material in accordance with 404(b)(1) Guidelines (40 CFR Section 230, Subparts B through H)
  • Attachment B3.   General policies for evaluating Section 10 RHA and 404 CWA Permit Decisions (33 CFR 320.4)
  • Attachment B4.   Compliance with environmental requirements (33 CFR 320.3 Related Laws)
1 MB
Attachment B5
  • Attachment B5.   Applicant's compensatory mitigation plan ("Block 23. Avoidance, minimization, and compensation")
23 MB
Attachments B6 and C
  • Attachment B6.   State of Alaska certificate of reasonable assurance for the Donlin Gold Project
  • Attachment C1.   BLM selected mitigation from Chapter 5 of the Final EIS
  • Attachment C2.   ANILCA Section 810 summary
635 KB


Related Documents

Background documents   --   Donlin Gold website.   Includes:

Permit Application
The Draft Section 10/404 Permit Application (dated October 5, 2015) is called:   Update to Preliminary application for Department of the Army permit--Donlin GoldProject (POA-1995-120).   It is available as an ARLIS Internet resource as well as from the Donlin Gold Project EIS documents website (see link above).

Donlin Gold Project, draft environmental impact statement.   November 2015

Donlin Gold Project, final environmental impact statement.   April 2018