Donlin Gold Project, final environmental impact statement.


Author:   US Army Corps of Engineers.   (Prepared by Alaska District, Regulatory Division)

Publication:   JBER, AK : CEPOA-RD, [2018]

April 2018.

Physical description of original:   1 CD-ROM : color illustrations, color maps, plans ; 4 3/4 in., in folder 28 x 13 cm.



Notes:

Section 508 Compliancy
As stated on the Donlin Gold Project EIS documents website, this document is not fully Section 508 compliant.   See that EIS webpage for more information.

Related documents
A list of related documents follows the Draft EIS below.



LINKS VIA ARLIS DOCUMENT SERVER



ContentsSize
Executive summary5.6 MB

Cover

Title page

Table of contents

Acronyms and abbreviations

690 KB
Chapter 1.   Project Introduction and Purpose and Need719 KB
Chapter 2.   Alternatives12 MB
Chapter 3.   Environmental analysis
73 KB
2 MB
6.5 MB
3.3 MB
2 MB
9.5 MB
3 MB
6 MB
3 MB
2 MB
8 MB
15 MB
5.7 MB
2.7 MB
1.6 MB
2.8 MB
178 KB
7.6 MB
1 MB
1.5 MB
825 KB
20 MB
1.4 MB
201 KB
2 MB
111 KB
1.3 MB
87 KB
Chapter 4.   Cumulative effects851 KB
Chapter 5.   Impact avoidance, minimization, and mitigation297 KB
Chapter 6.   Consultation and coordination2 MB
Chapter 7.   List of preparers194 KB
Chapter 8.   Distribution185 KB
Chapter 9.   References1 MB
Glossary of terms296 KB
Appendix A.   Financial Assurance144 KB
Appendix B.   Scoping Report and Public Involvement Plan

The chief report contain within is formally titled: Donlin Gold Project, environmental impact statement, final scoping report.

18 MB
Appendix C.   Alternatives Development Process1 MB
Appendix D.   Pipeline Engineering Strip Maps8.7 MB
Appendix E.   PHMSA Enclosure B2.6 MB
Appendix F.   Supplemental Soil Information488 KB
Appendix G.   Stream Crossing, Water Extraction and Flow Reduction Data Tables2.6 MB
Appendix H.   Analysis of Mine Site Geochemistry1.7 MB
Appendix I.   Air Quality138 KB
Appendix J.   USACE Section 10 Rivers and Harbors Act / Section 404 Clean Water Act Permit Application

This application is formally titled: Permit Application for the Department of the Army Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act.

6 MB
50 MB
4 MB

35 MB
28 MB
27 MB
45 MB
Appendix K.   Supplemental Wetlands Table for Wetlands Section 3.11 -- Section 3.11 is listed above135 KB
Appendix L.   Wetlands Pipeline Strip Maps
42 MB
40 MB
Appendix M.   Compensatory Mitigation Plan44 MB
Appendix N.   ANILCA Section 810 Preliminary analysis of subsistence impacts748 KB
Appendix O.   Biological Assessments7 MB
Appendix P.   Corps Initiation of the Government-to-Government Relationship with Federally Recognized Tribes9 MB
Appendix Q.   Essential Fish Habitat Assessment10 MB
Appendix R.   Oil Discharge Prevention and Contingency Plans20 MB
Appendix S.   Pit Lake Ecological Risk Assessment2 MB
Appendix T.   Visual Pipeline Engineering Strip Maps49 MB
Appendix U.   Donlin Gold Invasive Species Prevention and Management Plan
  • Natural gas pipeline invasive species prevention and management plan, Donlin Gold Project. Revised Draft.
4.5 MB
Appendix V.   Supplemental Bird Data Tables for Wildlife Section 3.12 -- Section 3.22 is listed above426 KB
Appendix W.   Barge Plans
  • Technical memorandum: Proposed river barge stranding response methodology
  • Barge communication plan, Donlin Gold Project. Revision 1.1
3.4 MB
Appendix X.   Comment Analysis Report   (Called "CAR" in table of contents)
1.5 MB
61 MB
58 MB
23 MB
2.3 MB
1.3 MB
Appendix Y.   Programmatic Agreement -- Draft Programmatic Agreement, April 2, 201810 MB
Appendix Z.   Public Easement Plan, Donlin Gold Project10 MB
Appendix AA.   Additional Regulatory Framework Information282 KB
Appendix AB.   Focused Risk Analysis -- Appendix to Section 3.22, Human Health (Section 3.22 is listed above)1.2 MB


Related Documents

Background documents   --   Donlin Gold website.   Includes:

Permit Application
The Draft Section 10/404 Permit Application (dated October 5, 2015) is called:   Update to Preliminary application for Department of the Army permit--Donlin GoldProject (POA-1995-120).   It is available as an ARLIS Internet resource as well as from the Donlin Gold Project EIS documents website (see link above).

Donlin Gold Project, draft environmental impact statement.   November 2015

Donlin Gold Project, Joint Record of Decision and Permit Evaluation, U.S. Army Corps of Engineers, Bureau of Land Management, Crooked Creek, AK.   August 13, 2018.