Willow Master Development Plan, Supplement to the Draft Environmental Impact Statement.
Author: Prepared by U.S. Department of the Interior, Bureau of Land Management, Anchorage, Alaska ; in cooperation with: U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, U.S. Department of Transportation, Native Village of Nuiqsut, Inupiat Community of the Arctic Slope, City of Nuiqsut, North Slope Borough, State of Alaska.
Publication: Anchorage, Alaska : U.S. Department of the Interior, Bureau of Land Management, Alaska State Office, [2020]
March 2020.
Physical description of original: 1 volume (276 pages in various pagings) : 5 color charts, 82 color maps ; 28 cm.
Standard technical report numbers: DOI-BLM-AK-0000-2018-0004-EIS ; BLM/AK/PL-19/012+1610+F010
Supplement to: Willow Master Development Plan Draft Environmental Impact Statement. August 2019.
LINKS VIA ARLIS DOCUMENT SERVER
VOLUME | SECTION | SIZE |
Volume 1 | Chapters 1 through 5 ; Glossary, and References | 3 MB |
Volume 2 | Appendix A. Figures
| 36 MB |
Volume 3 | Appendices B through D
| 27 MB |
The Draft Environmental Impact Statement is also available online and in print.
For alternative access, you can also consult the BLM website for the Willow Master Development Plan with links to this Supplement to the Draft EIS and to related documents. Those documents include: the full Draft EIS, the notice of availability, publicly requested documents, ConocoPhillips produced material, request letters to extend the Draft EIS comment period, Draft EIS meeting transcripts, Draft EIS comment from the public and agencies, press releases, notice of intent, public scoping comments, and public scoping meeting transcripts.