101
Canal which is prone to congestion The company is seeking opportunities in western Canada as well
102
Canal to Asia The company on Aug 4 said it signed five 10 and 15 year supply contracts with new
103
unit FSU that will receive and store LNG off the coast of Colon a port on the mouth of the Panama Canal
104
the Mediterranean and the Suez Canal takes 32 days according to the U S Energy Information Administration The idea
105
day run via the Suez Canal to East Asia More than 95 percent of Yamal’s capacity has already been sold
106
Aframax tankers are sized to fit through the Panama Canal before its expansion last year The United
107
via the Suez Canal Fluxys Belgium is the independent operator of the natural gas transmission grid
108
feet of gas as LNG The new ships will be capable of passing through the expanded Panama Canal
109
the standard journey between Europe and Asia through Egypt s Suez Canal If Russia s gamble pays off within
110
for the Suez Canal will end up in India while those loaded onto very large crude carriers off the north coast
111
American crude at consultancy Energy Aspects New refinery capacity coming online east of the Suez Canal
112
?utm_source=substack utm_medium=email which is located close to the key shipping channel the Suez Canal
113
the time to reach China from Russia s Baltic ports than the standard passage through the Suez Canal
114
and is traveling toward the Panama Canal Bloomberg shipping data showed At least seven other cargoes originally
115
Coast LNG terminals that have to send tankers through the Panama Canal to reach customers in Asia Costa
116
congestion for U S LNG cargoes at the Panama Canal according to Platts Analytics LNG suppliers are continuing
117
Coast facilities avoiding Panama Canal crossings and presenting a cheaper alternative to U S gas
118
to reach Asia via the Bering Strait in 15 days versus 30 days by the Suez Canal ” The vessel was designed
119
and is currently anchored in the Suez Canal with oil onboard the London Exchange data showed Another vessel under
120
via the Suez Canal would take about 45 to 50 days on average Floating gas production facility on its