1
of seafloor have been removed as part of the development of Yamal LNG Arctic LNG 2 and the Novy Port projects
2
of active oil and gas pipelines on the Gulf of Mexico seafloor and for decades have allowed the industry
3
The project — which uses a new technology to tie 11 giant turbines to the seafloor — has received mixed
4
to the seafloor with steel and concrete anchors Rosmorport said The federal port authority will be responsible
5
for development of the concrete and steel structure that would be sunk to the seafloor to support the https: www
6
conducted a successful experiment with methane hydrates the cage like lattices of seafloor ice that contain
7
miles of water before going even deeper through the seafloor Galp budgeted 200 million to 300 million
8
miles below the seafloor in search of oil for Chevron The hunt for offshore petroleum is on again fueled
9
multiple times every month The tank farm and infrastructure cover 1 060 acres of land and seafloor
10
the reserves with a seafloor installation connected to existing infrastructure at Conoco s Ekofisk field some
11
That’s equal to dredging 10 feet of seafloor from an area 3 miles by 3 miles Coal’s price advantage over
12
The towering structures will be anchored to the seafloor to create a production and export terminal Arctic LNG
13
There is also a decision pending on Woodside’s plans to build a pipeline on the seafloor in an area now known
14
will entirely be based on a floating production platform anchored to the seafloor The Norwegian open deck heavy
15
project with such structures that will sit on the seafloor with production equipment on top