|
|
|
|
LEADER |
01302cmm a22003853 4500 |
001 |
1470499 |
003 |
SIRSI |
008 |
121011s2007 000 0 eng u |
100 |
1 |
|
|a Chukwu, Godwin A.
|
100 |
1 |
|
|a Khataniar, Santanu
|
100 |
1 |
|
|a Patil, Shirish
|
100 |
1 |
|
|a Dandekar, Abhijit
|
245 |
1 |
0 |
|a Operational challenges in gas-to-liquid (GTL) transportation through Trans Alaska Pipeline System (TAPS)
|
250 |
|
|
|a Revised
|
260 |
|
|
|a Institute of Northern Engineering. Petroleum Development Laboratory
|
518 |
|
|
|a March 2007
|
300 |
|
|
|a 154 p.
|
380 |
|
|
|a Report
|
500 |
|
|
|a Final report.
|
546 |
|
|
|a English
|
536 |
|
|
|a Cooperative Agreement No. DE-FC26-01NT41228
|
653 |
|
|
|a Costs
|
653 |
|
|
|a Gas-to-liquids (GTL)
|
653 |
|
|
|a Liquefied natural gas (LNG)
|
653 |
|
|
|a Production
|
653 |
|
|
|a Technology
|
653 |
|
|
|a Carbon dioxide
|
610 |
|
|
|a Trans-Alaska Pipeline System (TAPS)
|
610 |
|
|
|a Alyeska Pipeline Service Company
|
610 |
|
|
|a North American Gas Pipeline Transportation System (NAGPTS)
|
648 |
|
|
|a October 1, 2001 to June 30, 2006
|
710 |
|
|
|a National Energy Technology Laboratory (NETL)
|
690 |
|
|
|a PF-PROJ
|
856 |
4 |
0 |
|u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_INE_2007_OperationalChallengesThroughTAPS.pdf
|
596 |
|
|
|a 10
|