Gas pipeline on the Yukon River bridge response to technical concerns
The results this preliminary assessment are from the investigation of the feasibility study of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline Company in a joint meeting with representatives from the State of Alaska, the Office of the Fe...
Saved in:
Corporate Author: | |
---|---|
Document Type: | Report |
Publisher: | Northwest Alaskan Pipeline Company |
Report Numbers: | Document no. H-17, Rev. 0 |
Date: | October 1, 1982 |
Series: | Alaska Segment : Alaska Natural Gas Transportation System
|
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
Summary: | The results this preliminary assessment are from the investigation of the feasibility study of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline Company in a joint meeting with representatives from the State of Alaska, the Office of the Federal Inspector and Alyeska Pipeline Service Company. |
---|---|
Physical Description: | 171 p. |
Notes: | Northwest Alaskan Pipeline Company is referenced as NWA in this report |