1
Published [1982]
...Susitna Hydroelectric Project. Feasibility report. Volume 6, Appendix C, Cost estimates, Final...

Report Number(s): APA 1423

Direct link to Volume 6, Appendix C.
Link to the feasability report (final draft) and list of all documents related to it.
2
Published [1982]
...Alaska Power Authority, Susitna Hydroelectric Project. Feasibility report. Volume 1, Engineering...

Report Number(s): APA 1291 APA 1292

Direct link to Sections 1-8.
Link to all sections.
Link to the feasability report (final draft) and list of all documents related to it.
3
Published [1982]
...Feasibility report...

Report Number(s): APA 95 APA 169 APA 174 APA 175 APA 176 APA 177 APA 178 APA 179 APA 180 APA 181 APA 182 APA 1414 APA 1415 APA 1416 APA 1417 APA 1418 APA 1419 APA 1420 APA 1421 APA 1422 SUS 38

Direct link to the first volume (Sections 1-8. Engineering and economic aspects).
List of all volumes of this feasibility report and a list of related documents.
5
Published [1982]
...Alaska Power Authority, Susitna Hydroelectric Project. Review and testimonies on Acres feasibility...

Report Number(s): APA 1293

Direct link to the review and testimonies.
Link to the feasability report (final draft) and list of all documents related to it.
6
Published [1960]

Report Number(s): APA 3490

Link to full text
7
Published [1983]
...Susitna Hydroelectric Project. Supplement to the feasibility report. Draft....

Report Number(s): APA 614

Direct link to Volume 1 only.
Link to the feasability report (final draft) and list of all documents related to it.
8
Published 1982]
...Watana Dam/Devil Canyon indirects feasibility report...

Report Number(s): APA 258

Link to full text
9
Published 1982]
...Susitna Hydroelectric Project feasibility report. Volume 4, Appendix A, Hydrological studies...

Report Number(s): APA 1142

Link to full text